V 1 Class Torpedo Boat (1884): Difference between revisions
From The Dreadnought Project
Jump to navigationJump to search
m (→Bibliography) |
mNo edit summary |
||
Line 1: | Line 1: | ||
Ten '''''V 1'' class torpedo boats''' were completed for the [[Imperial German Navy]] in | Ten '''''V 1'' class torpedo boats''' were completed for the [[Imperial German Navy]] in 1884. | ||
<div name=fredbot:ships> | <div name=fredbot:ships> |
Revision as of 23:51, 2 May 2016
Ten V 1 class torpedo boats were completed for the Imperial German Navy in 1884.
Overview of ten vessels | |||||
---|---|---|---|---|---|
Citations for this data available on individual ship pages | |||||
Name | Builder | Laid Down | Launched | Commissioned | Fate |
V 1 | AG Vulcan, Stettin | 1 Apr, 1884 | 11 Aug, 1884 | Broken up 1910 |
Design & Construction
Performance
Armament
- Two 37mm Hotchkiss machine guns
- Two 350mm torpedo tubes, four torpedoes
See Also
Footnotes
- ↑ German Warships 1815-1945 I. p. 154.
Bibliography
- Chesneau, Robert; Kolesnik, Eugene (editors) (1979). Conway's All the World's Fighting Ships 1860–1905. London: Conway Maritime Press. (on Amazon.com and Amazon.co.uk).
- Gröner, Erich (revised and expanded by Dieter Jung and Martin Maass) (1990). German Warships 1815-1945. Volume One: Major Surface Vessels. Annapolis: Naval Institute Press.
V 1 Class First Class Torpedo Boat | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
V 1 | V 2 | V 3 | V 4 | V 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
V 6 | V 7 | V 8 | V 9 | V 10 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<– | S.M.S. Jäger | Torpedo Boats (DE) | W 1 Class | –> | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<– | Schütze Class | First-class Torpedo Boats (DE) | W 1 Class | –> |