H.M.S. Neptune (1909): Difference between revisions
From The Dreadnought Project
Jump to navigationJump to search
Simon Harley (talk | contribs) m (HMS Neptune (1909) moved to H.M.S. Neptune (1909)) |
Simon Harley (talk | contribs) (Made Changes.) |
||
Line 1: | Line 1: | ||
{|align="right" border="2" cellpadding="2" cellspacing="0" style="margin: 0 0 1em 0.5em; background: #f9f9f9; border: 1px #aaa solid; border-collapse: collapse; font-size: 95%;" width="300" | {|align="right" border="2" cellpadding="2" cellspacing="0" style="margin: 0 0 1em 0.5em; background: #f9f9f9; border: 1px #aaa solid; border-collapse: collapse; font-size: 95%;" width="300" | ||
|align="center" colspan="2"|''' | |align="center" colspan="2"|'''H.M.S. ''Neptune''''' | ||
|- | |- | ||
!style="color: white; height: 30px; background: | !style="color: white; height: 30px; background: crimson;"| Career | ||
!style="color: white; height: 30px; background: | !style="color: white; height: 30px; background: crimson;"| Details | ||
|- | |- | ||
|Pendant Number: | |Pendant Number: | ||
Line 29: | Line 29: | ||
|Scrapped | |Scrapped | ||
|- | |- | ||
!colspan="2" align="center" style="color: white; height: 30px; background: | !colspan="2" align="center" style="color: white; height: 30px; background: crimson no-repeat scroll top left;"|General Characteristics | ||
|- | |- | ||
|Displacement: | |Displacement: |
Revision as of 11:50, 6 January 2009
H.M.S. Neptune | |
Career | Details |
---|---|
Pendant Number: | 79 (April, 1918) |
Builder: | HM Dockyard, Portsmouth |
Ordered: | 1908 Naval Estimates |
Laid down: | 19 January, 1909 |
Launched: | 30 September, 1909 |
Commissioned: | 1 February, 1911 |
Sold: | 1 September, 1922 |
Fate: | Scrapped |
General Characteristics | |
Displacement: | 19,680 (loaded condition) |
Length: | 510 feet |
Beam: | 85 feet |
Draught: | 28 feet 6 inches |
Propulsion: | 4 shaft Parsons turbines, 25,000 shp, 18 Yarrow boilers |
Speed: | 21 knots |
Range: | 6,330 miles at 10 knots |
Complement: | 759 |
Armament: |
|