U.S.S. Sturgeon (1911)
From The Dreadnought Project
Jump to navigationJump to search
U.S.S. Sturgeon (1911) | |
---|---|
Hull Number: | SS-25 |
Builder: | Fore River[1] |
Launched: | 15 Jun, 1911[2] |
Commissioned: | 14 Feb, 1912 |
Decommissioned: | 20 Oct, 1921 |
Sold: | 19 Apr, 1922 |
U.S.S. E-2, named U.S.S. Sturgeon until shortly before completion, was one of two Skipjack (or "E") class submarines completed for the U.S. Navy.
She commissioned on 14 February, 1912 with Ensign Clarence N. Hinkamp in command.
Service
Captains
- Ensign Clarence N. Hinkamp, 14 February, 1912
- Lieutenant (Junior Grade) Dallas C. Laizure, before 1 January, 1914[3]
- Lieutenant (Junior Grade) Charles M. Cooke, Jr., before 1916[4]
See Also
Footnotes
Bibliography
Skipjack Class Submarine | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Skipjack | Sturgeon | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
<– | Seal Class | Submarines (US) | Carp Class | –> |