Difference between revisions of "H.M.S. Caradoc (1916)"

From The Dreadnought Project
Jump to: navigation, search
(Created page with '{|align="right" border="2" cellpadding="2" cellspacing="0" style="margin: 0 0 1em 0.5em; background: #f9f9f9; border: 1px #aaa solid; border-collapse: collapse; font-size: 95%;" …')
 
(Alterations)
Line 30: Line 30:
 
==Alterations==
 
==Alterations==
 
''Caradoc'' was fitted with a director in June, 1917.  This alteration required her pole mast to be replaced with a tripod mast for greater rigidity.<ref>''The Technical History and Index: Fire Control in HM Ships, 1919'', pp. 11-12.</ref>
 
''Caradoc'' was fitted with a director in June, 1917.  This alteration required her pole mast to be replaced with a tripod mast for greater rigidity.<ref>''The Technical History and Index: Fire Control in HM Ships, 1919'', pp. 11-12.</ref>
 +
 +
==Captains==
 +
Dates of appointment given:
 +
 +
*{{CaptRN}} [[William Munro Kerr|William M. Kerr]], 12 June, 1917.<ref>''Navy List'' (December, 1918).  p. 751.</ref>
  
 
==See Also==
 
==See Also==

Revision as of 05:00, 11 August 2011

H.M.S. Caledon
Career Details
Pendant Numbers: A0 (Jun 1917)
28 (Jan 1918)
55 (Apr 1918)[1]
Built By:
Laid Down:
Launched: 23 December, 1916
Commissioned:
Sold:
Fate:

Alterations

Caradoc was fitted with a director in June, 1917. This alteration required her pole mast to be replaced with a tripod mast for greater rigidity.[2]

Captains

Dates of appointment given:

See Also

Footnotes

  1. Dittmar; Colledge. British Warships: 1914-1919.
  2. The Technical History and Index: Fire Control in HM Ships, 1919, pp. 11-12.
  3. Navy List (December, 1918). p. 751.

Bibliography

Template:Caledon Class (1916)