U.S.S. L-3 (1915)

From The Dreadnought Project
Jump to: navigation, search
U.S.S. L-3 (1915)
Hull Number: SS-42
Builder: Fore River Shipbuilding Company[1]
Laid down: 18 Apr, 1914
Launched: 15 Mar, 1915[2]
Commissioned: 22 Apr, 1916
Decommissioned: 11 Jun, 1923
Broken up: 1932[3]
U.S.S. L-3 was one of eleven "L" Class submarines completed for the U.S. Navy.

Service

L-3 was commissioned on 22 April, 1916 with Lieutenant (Junior Grade) Deupree J. Friedell in command.

Captains

See Also

Footnotes

  1. Conway's All the World's Fighting Ships 1906–1921. p. 129.
  2. Conway's All the World's Fighting Ships 1906–1921. p. 129.
  3. Conway's All the World's Fighting Ships 1906–1921. p. 129.

Bibliography


"L" Class Submarine
Electric Boat Design
L-1 L-2 L-3 L-4 L-9
  L-10 L-11  
Lake Design
  L-5 L-6 L-7 L-8  
<– Haddock Class Submarines (US) U.S.S. M-1 –>